Ceiling Painting Plan
The easiest paint calculation in the house. Buy for two coats and read the tin's own coverage.
BFCBrilliance · bfcbrilliance.com/tools/ceiling-paint-calculator
The ceiling
- Room
- Date
- Length
- Width
- AREA
- Coverage from the TIN
- Coats
- GALLONS
- Perimeter to cut in
- Product
- Colour
Figures and rules
- Ceiling paint coverage
- about 350 sq ft/gal
- Paint generally
- 300-400 sq ft/gal
- Textured / popcorn
- use the LOW end — it drinks paint
- Gallons
- area x coats / coverage
- 12 x 14 ceiling, 2 coats
- 0.96 gal — just under one
- Deductions
- NONE — a ceiling has nothing to deduct
- ⚠ Coats
- TWO, unless repainting the same colour
- Finish
- FLAT — it hides imperfections
- ⚠ Water stain
- fix the leak, then STAIN-BLOCKING primer
- Pink-when-wet paint
- so you can see where you have been
Doing it
- Leak found and fixed FIRST, if there is a stain
- Stain-blocking primer on any marks — not just more coats
- Bought for TWO coats
- Coverage read off the tin, low end if textured
- Flat finish chosen, not satin
- Floor and furniture covered — ceiling work drips on everything
- Perimeter cut in by brush before rolling
- Rolled in one direction, then across, while wet
- Working away from the window so raking light shows misses
- Second coat only after the tin's stated recoat time
The second coat is where people come up short
One coat is enough only over the same colour on a sound ceiling. A colour change, new plasterboard, a patch or anything being covered takes two — and buying for one is the commonest way to be short. The one-coat figure is shown separately so the difference is visible before you buy.
Flat is correct, not cheap
Flat scatters light instead of reflecting it, hiding the joints, patches and roller marks that a ceiling has more of than any wall. Satin looks sharper in the tin and shows every flaw once it is up, especially under raking light from a window.
Cutting in is most of the labour
The perimeter is brushed by hand before the roller starts, and on a small ceiling that edge is a large fraction of the work. It is not paint, so no calculator shows it — but it is what decides whether this is an hour or an afternoon.