Bags for a small pour - and the point where bags stop being sensible, which is around 45 of them and two tons of lifting.

Enter the shape you are filling and the bag size. The output worth reading second is the total weight - it is what tells you whether this is a bag job at all.

Your details

The yield is the number that matters. 60 lb is the usual DIY compromise.

Set this to match the bag size above — it drives the total weight.

5-10% is normal. An uneven subgrade is the usual reason.

Result

Bags to buy
10

Rounded up — and round up again rather than risk running short.

That weighsPounds. READ THIS ONE — it decides whether bags are the right approach at all.
800
Concrete neededCubic feet, before waste.
5.33
In cubic yardsAbove about 1, ready-mix is usually cheaper and always easier.
0.198
Bags in a full cubic yard45 for 80 lb, 60 for 60 lb, 90 for 40 lb.
45
A cubic yard as bags weighsPounds. This is the argument for ready-mix, in one number.
3,600
Roughly this much waterQuarts, at about 3 per 80 lb bag. FOLLOW THE BAG — too much water is the commonest way to weaken concrete.
30

About this tool

How Many Bags of Concrete Do I Need?

One cubic yard is forty-five 80 lb bags — 3,600 pounds to buy, carry, lift and mix. The weight decides the job, not the bag count.

Free download

Concrete Bag Order Sheet

Check the weight before the bag count. That is what decides whether this is a bag job or a truck job.

Free, no email required — print it or save it as a PDF.

Share it

Concrete Bag Calculator infographic

The key numbers as one image — free to save, share, or embed on your own site with credit.

How this is calculated

A bag of concrete mix yields far less volume than its weight suggests, because most of the weight is aggregate that packs down. THE PUBLISHED YIELDS, and they are the whole calculation: 40 lb bag - 0.30 cubic feet 60 lb bag - 0.45 cubic feet 80 lb bag - 0.60 cubic feet A cubic yard is 27 cubic feet, so that works out at 90, 60 and 45 bags per yard respectively. Those are clean numbers and worth remembering. ⚠️ FORTY-FIVE 80-POUND BAGS IS 3,600 POUNDS - nearly two tons, to buy, transport, lift and mix, for ONE cubic yard. That is the number that should decide the job, not the bag count. Ready-mix delivered by truck is usually cheaper and always easier somewhere around the one-yard mark, and often below it once you price your own weekend. So read the weight output before the bag output. Bags are right for post holes, small pads, steps and repairs. They are wrong for a driveway, and people discover that on the day. WASTE IS REAL HERE and five to ten percent is normal - spillage while mixing, mix left in the barrow, and a subgrade that is never quite as flat as the measurement assumed. An uneven excavation is the big one: a slab specified at four inches that averages four and a half needs twelve percent more concrete than the arithmetic says, and nothing about the site will tell you in advance. ⚠️ YOU CANNOT PAUSE A POUR. Concrete begins setting as soon as it is mixed, and a slab poured in two sessions an hour apart has a cold joint through it - a permanent plane of weakness. So this is one of the few materials where running short is not an inconvenience but a structural defect. Buy the extra bag. Unopened bags can usually go back; a cold joint cannot. BAGS DO NOT KEEP WELL. Cement absorbs moisture from the air, and a bag stored in a damp garage over a winter can set solid in its own sack or simply cure weak. Buy for the job, store what is left dry and off the floor, and treat a hard bag as rubbish rather than a bargain. This calculates VOLUME for a rectangular shape. For a cylinder - a post hole, a pier - work out the volume as pi times the radius squared times the depth, and for anything irregular break it into rectangles.

Common questions

How much does one bag actually make?
Much less than its weight suggests, because most of that weight is aggregate. An 80 lb bag yields 0.60 cubic feet, a 60 lb bag 0.45, and a 40 lb bag 0.30. Since a cubic yard is 27 cubic feet, that is 45, 60 and 90 bags per yard. Those are the published figures and they are unusually clean, which makes them worth memorising - it is the fastest sanity check available on a concrete order.
When should I stop using bags?
Look at the weight rather than the count. One cubic yard is forty-five 80-pound bags - 3,600 pounds, nearly two tons to buy, transport, lift and mix, one bag at a time. Ready-mix delivered by truck is usually cheaper and always easier somewhere around that mark, and often below it once you price your own weekend. Bags are right for post holes, small pads, steps and repairs; they are wrong for a driveway, and people tend to find that out on the day.
Why does the waste allowance matter so much?
Because the ground is never as flat as the measurement assumed. Spillage and mix left in the barrow account for a little, but the big one is the excavation: a slab specified at four inches that actually averages four and a half needs twelve percent more concrete than the arithmetic says, and nothing about the site tells you in advance. Five to ten percent is normal, and on a rough subgrade the higher end is not pessimism.
What happens if I run short?
Something worse than a second trip. Concrete begins setting as soon as it is mixed, so a slab poured in two sessions an hour apart has a COLD JOINT through it - a permanent plane of weakness where the two pours never bonded. This is one of the few materials where running short is a structural defect rather than an inconvenience, which is why the advice is always to buy the extra bag. Unopened bags can usually go back to the store; a cold joint cannot be undone.
Can I keep leftover bags for next time?
Not reliably, and this catches people. Cement absorbs moisture from the air, so a bag left in a damp garage over a winter can set solid inside its own sack, or worse, look fine and cure weak. Store what is left sealed, dry and off the floor - a pallet or a shelf, not concrete - and treat a bag that has gone hard as rubbish rather than a bargain. Weak concrete costs far more than a bag.
How much water do I add?
Whatever the bag says, and no more. The figure here - roughly 3 quarts per 80 lb bag - is a planning estimate for how much water to have on hand, not an instruction. Adding extra water makes the mix easier to work and measurably weaker, and it is the single most common way a home pour ends up under strength. Mix to the bag's ratio, and if it feels stiff, mix it longer rather than wetter.

Take it further with AI

Copy this into ChatGPT or Claude with your own numbers filled in. It hands over the figures this calculator worked out, so the answer is built on real arithmetic instead of a guess.

I used the Concrete Bag Calculator at https://www.bfcbrilliance.com/tools/concrete-bag-calculator.

What I entered:
- Length (ft): ___
- Width (ft): ___
- Thickness (in): ___
- Bag size: ___
- — and its weight: ___
- Waste allowance (%): ___

What it calculated:
- Bags to buy: ___
- That weighs: ___
- Concrete needed: ___
- In cubic yards: ___
- Bags in a full cubic yard: ___

Use those figures as given — they are already worked out, so please don't recalculate or estimate your own. Help me turn them into a plan: what to buy or do, in what order, roughly what it should cost, and the mistakes people most often make with this job.

Where the job touches structure, gas, or electrics, tell me to check local building code and whether a permit or a licensed trade is required.

Last updated

Get the next tool.

New tools and guides straight to your inbox. No spam, ever.

Part of a bigger job

How to Estimate Concrete

Bags or a truck, why slabs are quoted in cubic yards, and the post you forgot to subtract from the hole.

Walks through all 3 concrete tools in order.

More concrete tools