Deck Joist Span Reference
AWC DCA 6 Table 2. A prescriptive lookup, not a design — your building department has the final say.
BFCBrilliance · bfcbrilliance.com/tools/deck-joist-span-calculator
My deck
- Date
- Species
- Grade stamp
- Joist size
- Spacing
- SPAN NEEDED
- ALLOWABLE SPAN
- Span to spare
- Overhang wanted
- MAX OVERHANG
- Joists
- Permit no.
- Inspection date
Southern Pine — max joist span
- 2x6 at 12 / 16 / 24 in
- 9'11" / 9'0" / 7'7"
- 2x8 at 12 / 16 / 24 in
- 13'1" / 11'10" / 9'8"
- 2x10 at 12 / 16 / 24 in
- 16'2" / 14'0" / 11'5"
- 2x12 at 12 / 16 / 24 in
- 18'0" / 16'6" / 13'6"
Douglas Fir-Larch / Hem-Fir / SPF
- 2x6 at 12 / 16 / 24 in
- 9'6" / 8'4" / 6'10"
- 2x8 at 12 / 16 / 24 in
- 12'6" / 11'1" / 9'1"
- 2x10 at 12 / 16 / 24 in
- 15'8" / 13'7" / 11'1"
- 2x12 at 12 / 16 / 24 in
- 18'0" / 15'9" / 12'10"
Redwood / W. Cedar / Ponderosa / Red Pine
- 2x6 at 12 / 16 / 24 in
- 8'10" / 8'0" / 6'10"
- 2x8 at 12 / 16 / 24 in
- 11'8" / 10'7" / 8'8"
- 2x10 at 12 / 16 / 24 in
- 14'11" / 13'0" / 10'7"
- 2x12 at 12 / 16 / 24 in
- 17'5" / 15'1" / 12'4"
What the table assumes
- Live load
- 40 psf
- Dead load
- 10 psf
- Lumber grade
- No. 2
- Service condition
- wet
- Deflection limit
- L/360
- Span measured
- FACE of support to face of support
- Span excludes
- the overhang
- ⚠ Overhang cap
- table figure OR span/4, whichever is less
- ⚠ Joist length ceiling
- 18 ft (DCA 6, footing design)
- ⚠ Ledger minimum
- 2x8 nominal
- ⚠ Guard post joist minimum
- 2x8 nominal
- ⚠ Hot tub, roof, heavy snow
- NOT covered — get an engineer
- ⚠ Final authority
- your building department
Before you cut anything
- Permit applied for
- Grade stamp checked — species AND No. 2 grade
- Span measured face of support to face of support
- Overhang checked against BOTH limits
- Ledger at least a 2x8
- Any joist carrying a guard post at least a 2x8
- Ledger flashing planned — this is where decks fail
- Ledger fastening to the house structure, not just sheathing
- Joist hangers correct for the size, with the right nails
- Hot tub or roof declared to the inspector
- Local amendments checked with the building department
- Inspection booked before anything is covered up
This is a lookup, not a design
DCA 6 is a prescriptive guide — pre-approved answers for ordinary cases. It knows nothing about your soil, a hot tub, a roof or your snow load. Your building department has the final say, and a permit and inspection are not optional.
Spacing is the cheap lever
A Southern Pine 2x10 goes from 11'5" at 24 in centres to 14'0" at 16 in — two and a half feet of span for a few more joists. Going up a nominal size means deeper lumber across the whole deck, and often deeper beams too.
The ledger is where decks fail